by Andrew Lees, on 28-Nov-2019 04:50:59
Liquefaction can occur when saturated or partially saturated loose sands lose strength and stiffness due to a rapid increase in pore water pressure due to cyclic loading, such as during …
Read Storyby Andrew Lees, on 21-Nov-2019 05:43:00
What is geotechnical settlement? In geotechnical engineering, settlement is defined as the downward movement of the ground due to changes in stresses within it. Excessive ground movements can cause damage …
Read Storyby Andrew Lees, on 14-Nov-2019 05:23:57
What is plate load testing and why is it needed? Plate load testing involves the increasing loading of a circular steel plate placed on a ground surface and measuring the …
Read StoryTemporary site roads & Working platforms
16/03/2021 11:00AM GMT
Units 2-4 Cunningham Court,
Shadsworth Business Park,
Blackburn,
BB1 2QX
T: +44(0)1254 262431
www.tensar.co.uk